Power Shutdown in Srinagar

SRINAGAR: Power Controller, Kashmir Province, PDD Bemina today informed that in order to carry out branch cutting, maintenance of 33 KV Lines the power supply to Nowpora Seelu and Arampora Panzipora receiving stations would be shut down from 9.00 am to 5 pm on 26th November 2018 and 28th November 2018 respectively.

The office further informed that to 33 KV HCC feeder emanating from 132/33 KV grid station Badampora would remain shutdown on 20th November 2018 from 9 am to 5 pm to carry out the necessary repair work.

The power supply to the areas fed from the lines shall remain affected on the dates mentioned

Leave a Reply

Your email address will not be published.