Srinagar:  The Office of Power Controller, Kashmir province, Bemina, Srinagar today informed that 33 KV Wadwan/Sharifabad feeder would be shut down on April 24, April 25th, April 26th 2019 from 9 am to 6 pm to carry out the stringing of conductor of 220 KV D/C Zainakot-Alasteng TL at village Dharmuna.

This post was published on April 23, 2019